What Happens Before Bulk Lighting Production
Understand sample approval, driver checks, photometric review, burn-in testing, final inspection, and shipment documents.

Sample approval locks the build
The approved sample should lock the housing, LED module, driver, CCT, beam angle, finish, mounting parts, labels, packaging, and manual. Bulk production should not start until these items are aligned.
- Confirm wattage, input voltage, CCT, CRI, beam angle, and dimming protocol
- Approve finish sample, fixture label, manual, and carton artwork
- Keep one sealed approval sample as the bulk production reference
Inline checks catch electrical and assembly issues
During production, inline inspection focuses on housing finish, LED polarity, driver wiring, screw torque, light-up test, color consistency, burn-in, and packaging preparation.
- Light-up test, driver label, wire connection, and insulation check
- Color consistency, lens cleanliness, finish defects, and assembly fit
- Carton label, accessory pack, manual, and barcode consistency
Final review prepares the shipment
Before shipment, final checks should cover appearance, function, quantity, carton marks, packing list, compliance documents, and buyer-specific files such as IES, manuals, or test reports.
Catalog
Browse matching products
Factory
Check production capability
FAQ
Review MOQ and sampling questions
Need a matching fixture sample?
Send your material, size, logo, and packaging requirements. Our team can review the project and suggest a production-ready direction.
Start a sample request